Beskrivelse: Implenia partners with SKB to design and build deep underground tunnels and shafts for a geological repository near Forsmark, Sweden, by 2033. Les mer ↧
Verdi og størrelse
Miljøsertifiseringer
Ingen registrerte
Hva skal bygges?
Access tunnel to first storage level |
1 tunnel |
Vertical shafts for ventilation and elevator |
3 shafts |
Depth |
Up to 500 meters |
Central area |
1 area |
Aktører
Byggherre: Svensk Kärnbränslehantering
Arkitekt
Rådgivende ingeniør
Underentreprenør
Klikk på aktørene for å se kontakter
Siste utvikling: Implenia has signed an Early Contractor Involvement contract with SKB in June 2025 to plan, design, and build the initial underground section of the repository; the contract covers all phases through to project completion in 2033.
Neste steg: Planning phase to begin in autumn 2025, followed by design and construction phases; no project blockers mentioned.
Fase: Tidlig planlegging
Selskaper og personer
Bilder
Kilder
18. Jun 2025: Implenia
Implenia wins major contract for deep geological repository in Sweden . Project for long-term storage of radioactive waste in Eastern Sweden | Multiph...
https://implenia.com/no-no/media/artikel/implenia-wins-major-contract-for-deep-geological-repository-in-sweden/
18. Jun 2025: Implenia
Implenia wins major contract for deep geological repository in Sweden . Project for long-term storage of radioactive waste in Eastern Sweden | Multiph...
https://implenia.com/no-no/media/artikel/implenia-vinner-en-stor-kontrakt-for-et-dypt-geologisk-deponi-i-sverige/
Oppdateringer
18. Jun 2025
Byggekamera
Har dette prosjektet et byggekamera?
Send oss en link på olav@pekeberg.com,
så legger vi det til her.