Renewal of Waldenburg Railway Lot 6.1

Beskrivelse: The project involves upgrading the Waldenburg railway, including double track sections, new stops, a renovated terminus, and a new workshop, with an emphasis on flood protection and sustainability. Les mer ↧

Kategori

Rehabilitering

Infrastruktur

Jernbaner

Adresse

Hauptstrasse 10
Schweiz

Verdi og størrelse

742 mill NOK

Miljøsertifiseringer

Ingen registrerte

Hva skal bygges?

Total length

1.6 km

Soil removal

4700 m3

Excavation for retaining walls and flood protection

58000 m3

Trench excavation

20000 m3

Concrete demolition

11600 tons

Pavement demolition

13100 tons

Edge terminations

5900 m

Gravel excavation

3500 m3

New gravel supply

45000 m3

Concrete

8000 m3

Bored piles

6100 m

Pavement

5800 tons

Barrier layer

3200 tons

Sheet piling

12500 m2

Nail wall with shotcrete

4800 m2

Sewerage

1000 m

Edge terminations

9000 m

Perron angle elements

380 m

Aktører

Byggherre: BLT Baselland Transport AG Infrastruktur

Arkitekt

Rådgivende ingeniør

Entreprenør: Implenia Schweiz AG

Underentreprenør

Klikk på aktørene for å se kontakter

Siste utvikling: Construction work is in full swing with active earthworks, bridge demolition, special civil engineering works including pile driving, and construction of artificial structures like bridges and retaining walls. The project is meeting required handover deadlines despite complex logistics and environmental challenges.

Neste steg: Upcoming milestones include the demolition and rebuilding of the Holdenweg bridge, construction of the new Hirschlang and school footbridges, and completion of civil engineering and hydraulic works. Compliance with cantonal environmental regulations and effective management of groundwater and soil materials are critical for ongoing progress.

Fase: Ferdig bygd

Byggestart OCTOBER 2020 Ferdigstilles JUNE 2023 2020 Q1 Q2 Q3 Q4 2021 Q1 Q2 Q3 Q4 2022 Q1 Q2 Q3 Q4 2023 Q1 Q2 Q3 Q4 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 Q4

Selskaper og personer

Aegerter & Bosshardt AG

Byggeledelse

Vunnet/kontrahert

Sentralbord

Sentralbord

IG Lampenstein

Byggeledelse

Vunnet/kontrahert

Sentralbord

Sentralbord

Implenia Schweiz AG

Entreprenør

Vunnet/kontrahert

Sentralbord

Sentralbord

Bilder

Renewal of Waldenburg Railway Lot 6.1
Renewal of Waldenburg Railway Lot 6.1
Renewal of Waldenburg Railway Lot 6.1
Renewal of Waldenburg Railway Lot 6.1
Renewal of Waldenburg Railway Lot 6.1
Renewal of Waldenburg Railway Lot 6.1

📸 Upload a photo

Share an in illustration or a photo of this project. It is a great way to show off the work you and your company is doing.

Kart

Klikk for å se tegnforklaringer

Oppdateringer

21. Mar 2025

  • Byggestart lagt til: OCTOBER 2020
  • Prosjektverdi lagt til: 742 mill NOK
  • Implenia Schweiz AG lagt til som Entreprenør
  • BLT Baselland Transport AG Infrastruktur lagt til som Byggherre
  • IG Lampenstein lagt til som Byggeledelse
  • Aegerter & Bosshardt AG lagt til som Byggeledelse